Plans
The highlighted part
in yellow is part of the Fitness and Aquatic Centre that needs to be added on top in order
for this bridge to be attached properly as the Fitness and Aquatic Centre is below the level
of the Square House.
In doing so, students will now be able to have access to the Fitness and Aquatic Centre as they will enter through the lower part of the bridge. This also
encourages students to be active and have to walk or make their way down to the
lowest level of the bridge in order to access the Fitness and Aquatic Centre.
No comments:
Post a Comment